Bricks guide
Building a house in Zimbabwe from abroad
By the BuildMate team ·
Building on a stand back home while you live in London, Johannesburg, Houston or Sydney is common, and so is the worry that comes with it: is the money buying what you were told it would? Here is how to buy the materials yourself and stay in control from wherever you are.
The usual problems, and what fixes them
| Problem | What fixes it |
|---|---|
| Cash sent to a relative or builder to buy materials, with no receipt | Pay the supplier directly, for a numbered quotation |
| “The price went up” calls after you have paid | A written price that includes transport and road fees, held until a set date |
| Not knowing whether the bricks arrived, or how many | Photos of the offload at the stand and an order page you can check |
| Nobody on site when the truck comes | A named person on site, called before the delivery day |
Step 1: work out what you need
Ask your builder for the quantities from the plan, then check them yourself. A typical four-roomed house needs about 12,000 bricks; our guide on how many bricks to build a house shows the working, and the brick calculator does it for any wall. If the builder's figure is far above yours, ask why before you pay for it.
Step 2: price it delivered to the stand
A yard price per 1,000 bricks is only part of the cost. Transport from the kilns to your stand, and any toll gates on the way, can add a lot, especially outside Harare. Get a delivered price: pick the bricks and the quantity, find the stand's suburb or town on the map, and you see the full price in US dollars with each trip listed. Every price comes as a numbered quotation (PDF) you can send to your builder to check.
Step 3: pay the supplier, not a middleman
Pay for the quotation itself, by Visa or Mastercard, debit or credit, from any country. The card is taken on the payment provider's secure page; your bank converts from pounds, rand, dollars or euros at its own rate. You get a receipt by email, and the order is in your name.
If family at home already has a quotation from us, you don't need to start again: every quotation has an 8-character code printed on it. Type it in at buildmate.co.zw/pay and you see exactly what you are paying for before you pay.
Step 4: name who receives it
At checkout, give the name and phone number of whoever will be on site: a relative, your builder or a caretaker. We call them to agree the day, and the driver calls on the way. They should count the pallets with the driver before offloading starts; our guide on choosing bricks lists the checks to make on delivery.
Step 5: see it delivered
We photograph the bricks offloaded at the stand and put the photos on your order page, then send you the link on WhatsApp. The page shows where the order is up to and whether it is paid, so you can follow it from your phone without waiting for someone to call you back.
A big order? Ask for a better price
Building a whole house is a big order. If the price on your quotation is more than you hoped, tap “Ask us for a better price” on it and tell us why. Whatever we agree on WhatsApp is written onto the same quotation, so the lower price is the one you pay.
Ready to start?
See ordering from abroad for how it works and the questions people in the diaspora ask us, or compare the bricks from each yard with photos and measured sizes.
